Sand Blasting
Blasting and Painting
Blasting and painting work is carried out at our own facility and also field locations utilizing the latest technology equipment and processes.
Blasting and painting procedures detail maximum time between blasting and painting in variations of humidity
Portable Blast Equipment
air to a single or multiple "blast pots".
Gold Mark was carried out by several Sand Blasting projects
and got a declaration certificates from foreign companies
and these are as follows:
Gold Mark contracted with Nabors maintenance company Rig No. 226 thousand Pace Safer has also been working full rig abrasive sand and all its accessories Twank were sprayed coating full rig was done with the best implementation
Has been contracted date: 2006
65 66 67
Gold Mark contracted with the company website ŢŃćČ maintenance digger in Hadramout Aldilaah as was work Digger Qaeda and Saybah abrasive sand and all its accessories from Twank was full of spray paint rig was done with the best implementation
date: 2007
68 69
Gold Mark contracted with Nabors maintenance company rig No. 217 masillah nexn has also been working full rig abrasive sand and all its accessories Twank were sprayed coating full rig was done with the best implementation
Has been contracted date: 2009
70 71
Gold Mark contracted company CMC heavy maintenance equipment, abrasive sand 8 Kanawort and 6 Tank and patriarchal coating in Safer site has been contracted date: 2004
72 73 74
Gold Mark contracted with m. b. Rig maintenance Petroleum abrasive sand and 6 Tank and patriarchal coating in Oxy site has been contracted
date: 2005
75 76
Gold Mark contracted with Yemen Hunt Oil maintenance equipment, generators and other abrasive sand and paint patriarchal Safer hired
on :2000
77 78 79